Share

Post Guide Long #6090

$69.50

Long Post Guide: Allows water level more fluctuation than the regular post guide. As water level changes, the distance too and from shore changes.

Use 1.5″ schedule 40 Galvanized Pipe driven through the opening. When water is high, pipe would go nearest the shore end of this bracket.